Arkansas inspection checklists
Based on the Arkansas Division of Environmental Quality (Department of Energy and Environment) Construction Stormwater General Permit ARR150000. Check each template against the current permit and your local requirements before relying on it.
-
Arkansas ARR15 site inspection
Routine stormwater inspection of an active construction site, from the entrance to the perimeter to the interior. For the operator's scheduled inspections and for MS4 or county oversight visits.
-
Arkansas post-storm inspection
Follow-up after a storm that causes runoff, or the storm size the permit names, focused on where water went and what controls failed.
Know when these checklists change
Permits and standards are reissued every few years, and the inspection requirements change along with them. Leave your email and we'll let you know when we update the Arkansas checklists or add new ones, which is a few emails a year at most.
You're on the list. We'll email you when the Arkansas checklists change.
That didn't go through. Check your email address and try again, or write to hello@inspectorjay.com.
Fill it in on your phone instead
In inspectorjay, each item gets a pass or fail, a dictated note, and geotagged photos, and the finished report goes to the contractor before you leave the site instead of waiting for the clipboard to make it back to the office.